Villa kitchen with walnut cabinetry and a grey marble island, bars of daylight from half-open shutters across a stone floor

Kitchens for Second-Home Owners in Mallorca

The house is here and you are not. A kitchen project run from another country is an ordinary project with one extra requirement: everything that would normally be decided by standing in the room has to be decided in writing, in advance, with somebody on the island who can open the door. Describe the kitchen and we pass the request to kitchen companies and kitchen specialists used to working that way.

One

request describes the job

Several

companies see it

Free

for you, always

No

obligation to accept

Oak door, marble offcut and grey porcelain sample propped on a limestone worktop in an oak kitchen, a terrace door open

What changes when the owner is abroad

Decisions move earlier. The choices a resident makes on a Tuesday afternoon by looking at a sample against the wall have to be made before the work starts, from samples sent or from one visit planned for exactly that. A written decision schedule, with dates, is what stops a project stalling while somebody waits for an answer in another time zone.

Responsibility narrows. One company responsible for the whole job, including the trades it needs, is worth more to an absent owner than three cheaper companies who each need coordinating. Ask who is in charge of the plumber, and whether the electrician is theirs.

And the calendar becomes the design. The work falls into the weeks the house is empty, which on this island usually means the winter, and the lead time for cabinetry and a worktop that arrive by sea is planned from the date you next arrive, backwards.

What an absent owner should ask for

  • One company responsible for the whole kitchen, trades included
  • A written brief and a written decision schedule, with dates
  • Photographs at each stage, and a call before anything irreversible
  • A named person on the island with a key, and the company’s agreement to work with them
  • A lead time from order to fitting, and what happens if the delivery slips
  • Surfaces and appliances chosen for a house that is shut for months
  • A handover you can read from abroad: what was done, what was not, what to check on arrival

Where second-home kitchens usually start

Kitchen renovation

The whole job, timed for the winter the house is empty.

Worktops

Which materials do not mind four months alone.

Property managers

If somebody manages the house for you, they are usually the key-holder the project needs.

How your request reaches a company

Mallorca Kitchens is a comparison service. A request for a kitchen project run from abroad goes to the kitchen companies and kitchen specialists on our list; they quote the work and carry it out, and any agreement is between you and the company you pick.

  1. 01

    Describe the job

    Tell us the property, roughly what you want and where it is. Photographs and a rough plan help, though neither is required.

  2. 02

    We match it

    The request goes to companies that work in your area and take on this kind of job at this size.

  3. 03

    They quote you

    Each company contacts you directly with its own price, timing and approach. We do not set any of it.

  4. 04

    You compare and choose

    Put the quotes side by side and take the one you want, or none of them. Using the site costs you nothing.

Can a kitchen really be done without me there?

Yes, and many are. The decisions move earlier, one company takes the whole job, somebody on the island holds a key, and the company sends photographs and calls before anything irreversible. One visit for the survey and the samples is worth planning; the rest can be done from anywhere.

When is the best time?

The winter, for most second homes: the house is empty, the companies are less stretched than in spring, and a kitchen fitted in February is ready for the first guests in May. Plan it backwards from your arrival date and forwards from the delivery.

What should be different about the kitchen itself?

Surfaces that do not mind being shut up: porcelain or quartz rather than wood, cabinetry specified for humidity, appliances that can be isolated, and a layout a guest can read on the first evening if the house is let.

Get quotes from companies used to absent owners

Describe the kitchen and when the house is empty, and let several companies price the same brief.

Mallorca Kitchens