How Long Does a Kitchen Renovation Take in Mallorca?

Vaulted kitchen with walnut cabinetry and a veined marble worktop and splashback, sunlight across a terracotta floor

Key takeaways

  • The site work is usually two to four weeks; the lead time before it is where the calendar goes.
  • The worktop is templated after the units are in, so there is a gap in the middle of the fitting.
  • Plan from the delivery date backwards, not from the strip-out forwards.
  • A second home is fitted in winter; a home lived in all year is fitted whenever the delivery lands.

The honest answer is two calendars. One is the fitting, which is measured in weeks. The other is everything before it: design, decisions, ordering, and a sea crossing for the cabinetry and the stone. The second is longer, and it is the one people forget when they say the kitchen will be done by Easter.

Stage by stage

StageWhat it takes
Brief and quotesA week or two to write the brief and receive comparable quotes, if the decisions are made.
Survey and designA week to a few weeks, depending on whether the layout changes and whether the kitchen is bespoke.
Ordering and lead timeThe long part. Fitted ranges cross by sea; bespoke kitchens are made and then cross. Weeks to months.
Strip-out and first fixA few days to a week: old kitchen out, water, waste and power to the new positions, walls and floor made ready.
Cabinetry fittingDays to a week, depending on the size and how much scribing the walls need.
WorktopTemplated once the units are in, then cut and fitted. A gap of a week or two in the middle of the job, with a temporary top if needed.
Appliances, lighting, finishingDays. Then the kitchen is used, and the snagging visit follows.

Where the time really goes

Decisions, first. A kitchen that waits three weeks for a worktop choice is three weeks later, and an owner abroad who is asked something on a Tuesday and answers the following Monday has added most of a week. A written decision schedule, with dates, is the single thing that keeps a renovation on its calendar.

Then the crossing. Cabinetry ordered from a mainland or German maker is made, shipped to a port and ferried, and a slab is cut here only after it has reached the island. Ask every company for its lead time from order to fitting, and treat the answer as the calendar.

The two kinds of house

A second home is renovated in the winter it is empty, planned backwards from the owner’s return: if the house is used from May, the kitchen is ordered in the autumn and fitted by March, with the gap for the worktop inside that. A home lived in all year is fitted whenever the delivery lands, with a temporary kitchen somewhere else in the house and a tolerance for dust.

The renovation page is where the request goes; the guide to renovating from abroad covers the second-home calendar in detail.

How long is the fitting itself?

Usually two to four weeks from strip-out to the finished kitchen, with a gap in the middle while the worktop is templated and cut. More if the layout changes and the plumbing moves.

Why is the lead time longer on Mallorca?

Because the cabinetry and the stone reach the island by sea. A mainland showroom quotes a lead time to its own door; here the kitchen has a crossing and a port in the middle of it.

Can it be done between two bookings?

Fronts and a worktop on sound carcasses, often. A whole kitchen with the layout unchanged, in ten days, sometimes. A new layout, no.

This might be interesting to you

Cream painted cabinetry scribed to an uneven plaster wall under a stone worktop, one oak drawer open, a terracotta floor
14.11.2026 9 min

Where Bespoke Kitchens for Mallorca Are Made, and What Each Route Changes for the Buyer

An island workshop, a mainland Spanish factory or a German or Italian import sold through a showroom...

Cream painted cabinetry scribed to an uneven plaster wall under a stone worktop, one oak drawer open, a terracotta floor
29.07.2026 4 min

Bespoke Kitchens in Mallorca: What to Know Before You Order One

When a kitchen made to the room earns its cost, what the process actually involves, where it is made...

Oak kitchen with a wide island and clear walkways, a stone floor and an arched opening to a terrace under a pergola
07.09.2026 3 min

Kitchen Renovation Mistakes to Avoid in Mallorca

Ten ways a kitchen project on the island goes wrong, each of them avoidable by a decision made a mon...

Restaurant dining room with timber tables and a stone arch onto a steel kitchen, shutters closed and pendants lit
19.09.2026 3 min

Commercial Kitchen Renovation in Mallorca: How the Winter Closure Is Used

A restaurant kitchen is rebuilt in the weeks it is closed, backwards from the reopening date. What t...

Mallorca Kitchens