New Kitchens in Mallorca
Sometimes there is no kitchen to renovate. The property has just been bought and the kitchen that came with it is going. The refurbishment has reached the last room. The house is new and the kitchen is a plan on a drawing. Describe the room and we pass the request to kitchen companies and kitchen specialists in your area.
request describes the job
companies see it
for you, always
obligation to accept
A new kitchen is a decision about the room first
With a renovation the room argues back: the drain is here, the window is there, the wall is stone. With a new kitchen in a finished shell or a new build, the room is quieter and the decisions are yours, which is harder than it sounds. Where the cooking happens, where people sit, whether the kitchen opens onto the terrace, whether an island is the centre of the house or an obstacle in it.
On Mallorca those decisions have a local shape. A kitchen that opens onto outdoor dining for eight months of the year is a different room from one that does not. A property let in summer needs a kitchen that a stranger can use on the first evening. A house occupied for six weeks a year does not need a walk-in larder.
Settling that before anybody prices a cabinet is what separates a new kitchen that fits the house from one that fits a showroom.
Which new kitchen is it?
The property has just changed hands
A refurbishment that reached the kitchen last
A new build or a development
What the room needs before a kitchen goes in
A new kitchen in a finished shell still has a building around it, and these are the things a company will ask about.
- Water and waste positions, and whether they can move
- The electrical supply, and whether it carries an induction hob, an oven and a fridge at once
- Extraction: a route to the outside, or a recirculating hood
- Wall construction, which decides how tall units are fixed
- Floor level and finish, and whether the floor goes under the units or up to them
- Ceiling height, for tall units and for pendant lighting over an island
- Access into the room for a worktop slab in one piece
- Whether the room is finished, or the kitchen goes in before the plasterer leaves
How a new kitchen usually runs
-
01
Brief and layout
How the room is used, where things go, what the kitchen has to open onto. Fitted or bespoke is decided here, because it decides who makes it.
-
02
Cabinetry, worktop and appliances
Chosen together. Each changes the others, and all three set the lead time.
-
03
Order
Most cabinetry and every worktop slab reaches the island by sea. The fitting date follows the delivery.
-
04
The room made ready
Water, waste, power and extraction where the layout needs them, and the floor and walls finished to the point the units want.
-
05
Fitting and finishing
Units, worktop templated and fitted, appliances connected, lighting, sealing, snagging once the kitchen has been used.
Fitted, or made for the room?
The decision that sets the price and the lead time.
Fitted kitchens
Bespoke kitchens
How your request reaches a company
Mallorca Kitchens is a comparison service. A request for a new kitchen goes to the kitchen companies and kitchen specialists on our list; they quote the work and carry it out, and any agreement is between you and the company you pick.
-
01
Describe the job
Tell us the property, roughly what you want and where it is. Photographs and a rough plan help, though neither is required.
-
02
We match it
The request goes to companies that work in your area and take on this kind of job at this size.
-
03
They quote you
Each company contacts you directly with its own price, timing and approach. We do not set any of it.
-
04
You compare and choose
Put the quotes side by side and take the one you want, or none of them. Using the site costs you nothing.
How far ahead should a new kitchen be ordered?
Further than on the mainland. Cabinetry and worktop slabs cross by ferry, and a kitchen ordered for a property that will be empty in February has to be planned from the delivery date backwards. Ask every company for its lead time from order to fitting.
Can the kitchen go in before the rest of the property is finished?
Better not, unless the company is coordinating the whole refurbishment. Dust, wet trades and other people’s tools are hard on a new kitchen, and the worktop in particular wants to be the last thing fitted.
Does a new kitchen need a designer?
Not always. A kitchen company plans a layout as part of the job. A separate design stage earns its cost when the room is open to the rest of the house, when it is awkward, or when the finish is at the top of the market.
The property is let in summer. What does that change?
The kitchen has to work for a stranger on the first evening: an obvious layout, robust surfaces, appliances that need no manual. It also changes the timing, because the work has to fall between bookings.