Commercial Kitchen Renovation in Mallorca
A restaurant kitchen is priced and planned nothing like a domestic one. It is a workplace that has to be closed for as short a time as possible, rebuilt around how the service runs, and handed back working. This is the page for restaurants, hotels, cafés, bars and beach clubs on the island. Describe the kitchen and we pass the request to kitchen companies and kitchen specialists that do commercial work.
request describes the job
companies see it
for you, always
obligation to accept
Downtime is the cost that is not on the quote
On an island whose season runs from spring to autumn, most commercial kitchen work happens in the winter closure, and the project is planned backwards from the reopening date rather than forwards from the last service. A company that has done this before will ask when the doors open again before it asks what the kitchen is made of.
The work itself is different from a domestic kitchen in almost every line: stainless steel work areas and wash-down surfaces, extraction and ventilation sized to the cooking, drainage that copes with a kitchen being hosed, floors and walls that are cleaned every night, and an electrical and gas supply for equipment that runs for twelve hours at a time.
And the layout is workflow. Delivery to cold store, cold store to prep, prep to line, line to pass, pass to wash-up and back. A renovation is the moment that flow gets fixed, and the companies that do this work start there.
What a commercial kitchen project usually covers
- Restaurant kitchen renovation, refurbishment or complete fit-out
- New openings, and the kitchen for a venue that has changed its concept
- Workflow: the route from delivery to pass to wash-up, redesigned
- Stainless steel work areas, wash-down walls and floors
- Equipment integration: cooking line, refrigeration, cold rooms, wash-up
- Extraction and ventilation, coordinated with the specialist who supplies it
- Drainage, grease management and floors that are hosed
- Electrical and gas supply for commercial equipment
- Storage: dry, cold and frozen, sized to the menu
- Phasing to keep part of the kitchen running, where the venue cannot close
How a commercial renovation usually runs
-
01
Reopening date first
Everything is planned backwards from it. Lead times for commercial equipment and extraction reach the island by sea like everything else.
-
02
Survey and workflow
The kitchen measured, the service watched or described, and the flow redesigned around the menu it will serve.
-
03
Specification
Surfaces, equipment, extraction, drainage, supply. The operator, the kitchen company and the specialists who supply extraction and equipment settle this together, including what the venue has to satisfy to reopen.
-
04
Strip-out and first fix
Old kitchen out, services and drainage relaid, walls and floors prepared.
-
05
Fit-out and commissioning
Stainless work, equipment set, extraction connected, surfaces finished, and the kitchen run before the first service.
What this page is, and what it is not
It is a way to get several commercial kitchen companies pricing the same fit-out, from one written brief. It is not an equipment supplier, and it is not the place for the regulatory questions a commercial kitchen carries. Food safety, ventilation, fire, permits and health requirements are settled between the operator, the kitchen company and the relevant authorities, and the companies on the list will say what applies to a venue in your municipality.
Two neighbouring jobs often travel with this one. The dining room, the bar and the front of house belong to a renovation contractor rather than a kitchen company. The extraction and climate side is a specialist trade of its own. Both can be asked for in the same brief and sent to different companies.
The commercial quote form asks for what these companies need: the business type, whether it is an existing kitchen or a new fit-out, the size, whether the venue is operating, the scope, equipment, extraction, electrical and plumbing changes, the timeline and the budget band.
How your request reaches a company
Mallorca Kitchens is a comparison service. A request for a commercial kitchen renovation goes to the kitchen companies and kitchen specialists on our list; they quote the work and carry it out, and any agreement is between you and the company you pick.
-
01
Describe the job
Tell us the property, roughly what you want and where it is. Photographs and a rough plan help, though neither is required.
-
02
We match it
The request goes to companies that work in your area and take on this kind of job at this size.
-
03
They quote you
Each company contacts you directly with its own price, timing and approach. We do not set any of it.
-
04
You compare and choose
Put the quotes side by side and take the one you want, or none of them. Using the site costs you nothing.
When is the best time to renovate a restaurant kitchen on Mallorca?
The winter closure, for almost every seasonal venue, planned backwards from the reopening date. Venues that stay open all year phase the work so that part of the kitchen keeps running, which is a different and longer project.
Does the page cover equipment?
As integration, yes: where the cooking line, refrigeration and wash-up go and what they need. It does not sell equipment, and a kitchen company will work with the equipment supplier you choose or propose its own.
What about the regulations?
They are settled between the operator, the kitchen company and the authorities for your municipality, and this site does not state what they require. The companies that do this work know what a venue has to satisfy to reopen and will say so in the brief.
Can a hotel kitchen be done in phases?
Often, and it is the normal way for a venue that cannot close. It costs more and takes longer than a closure, and it needs a company that has phased a kitchen before.
Get commercial kitchen quotes
Describe the venue, the kitchen and the reopening date once, and let several commercial kitchen companies price the same fit-out.